Work may include, but is not limited to, the procurement of all necessary permits, a site visit scheduled by the contractor to perform a preconstruction survey with the property owner and the City of Milwaukee prior to work beginning, scheduling the installation with the property owner, the procurement and distribution of water filter pitchers, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Temporary and permanent restoration requirements will be at the discretion of MWW. Project locations will be as shown on the project Site Maps and the contractor may be assigned replacement projects in one (or more) of the numbered work areas. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement – Equity Prioritization Program.