Description: The Project includes the following Work: The project will reconstruct approximately 1,260 feet of Hayden Street from Mill Street to Pearl Street (STH 95), approximately 960 feet of Mill Street from Hammond Street (USH 12) to Hayden Street and approximately 900 feet of Center Street from East Street to the east termini. Existing sanitary sewer will be replaced on all 3 streets, totaling approximately 2,800 feet of 8-inch to 12-inch PVC including manholes and service laterals. Existing watermain will be replaced on Mill Street and Center Street, totaling approximately 1,880 feet of 6-inch to 8-inch ductile iron including valves, fire hydrants and services. Street reconstruction will consist of asphalt pavement over dense graded base with ditching.