The Project includes the following Work: The project consists of reconstructing the Devil’s Lake Boat Landing within the Village of Webster. The work includes construction of a new reinforced concrete boat ramp, dewatering, modification of an existing dock system, unclassified excavation, aggregate base course, asphalt paving, pavement markings, demolition of an existing pit toilet, installation of a new vault toilet, installation of a steel MC 18X42.7 cap on an existing steel sheet pile wall, and turf restoration of all disturbed areas. Specifically the work includes: 1 L.S. 10-Inch Thick Reinforced Cast-In-Place Boat Ramp 1 L.S. Pre-Fabricated Concrete Restroom, Complete 50 LF Furnish & Install Metal Sheet Pile Cap 1 L.S. Ramp Construction Dewatering 1 L.S. Lakebed Excavating - Dredging 600 S.Y Geotextile Fabrics 200 CY Crushed Aggregate Base Course 150 CY Breaker Run 50 TON Asphaltic Pavement 100 LF Asphaltic Curb 400 SF 4-Inch to 6-Inch Thick Concrete Sidewalk 90 LF Pavement Markings The work is anticipated to begin shortly after the Fourth of July weekend. The anticipated substantial completion is 45 calendar days after the date when the contract times commence and final completion is within 70 calendar days after the date when the contract times commence.