Montgomery 2025 MFT & Infrastructure Road Program consists of Partial Depth Patching (Special) (1,735 SY), Hot-Mix Asphalt Surface Removal, Various Types (115,420 SY), Hot-Mix Asphalt Binder Course, IL-9.5, (8,630 TON), Hot-Mix Asphalt Surface Course, IL-9.5, (10,485 TON), Combination Concrete Curb & Gutter R&R (8,460 LF), Sidewalk Removal and Replacement (39,731 SF), Structure Adjustments (143 EA), Pavement Striping (997 LF), Sign Panel - Type 1 (256 SF), Telescoping Steel Sign Support (555 LF), HMA Driveway R&R (770 SY), HMA Bike Path R&R (1808 SY), Sodding, Special (3,662 SY), Traffic Control and Protection, Routing and Sealing Cracks (72,224 LF), Emulsified Maltene Based Rejuvenator (98,743 SY); The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of curb and gutter and sidewalk repair; hot-mix asphalt pavement reconstruction; adjustment of drainage structures; reconstruction of storm sewers; parkway restoration; and other incidental and miscellaneous items of work; CONST. PAVEMENT RESURFACING WITH HOT-MIX ASPH. SURF. CSE. MIX "D", N50 (530 TON); INCL. 12,800 SQ YD HMA SURF REM, 1 3/4 INCH; 1,250 FT LONG. JOINT SEALANT; 250 SQ YD CLASS D PATCHES; 250 FT COMB CONC CURB & GUTTER REM. & REPL.; 15 EACH DRAIN. & UTIL. STR. ADJ.; 48 FT THPL PVT MRK 24; ETC. (0.25 MILES)