The Project includes the following Work: The improvements are expected to consist of full-depth reconstruction of Eastland Drive with rigid concrete pavement between the intersections of Addison Ave to Falls Ave (approximately 4700-ft). Improvements also include the installation of ADA compliant pedestrian ramps along the corridor, and the replacement of curb and gutter as needed. The installation of new sidewalk to fill in the gaps along the corridor. This project will also install a new City domestic water main, service lines and meters along with the roadway construction within the limits as indicated on the plans. The project will also install PTV cameras and fiber conduit and manholes along the project limits.