The Scope of Work is to include but is not specifically limited to the supply and installation of an 18” force main and associated piping, casing, pumps, foundations, braces, restraints, coverings, valves, and connections to the County’s Wastewater Treatment Plant and the existing Hodgeville Pump Station as necessary to provide a complete project. • The Work is to include but is not specifically limited to the supply and installation of approximately 26,000 linear feet of 18” PVC force main, which includes approximately 2,400 linear feet of pipe to be installed via directional drill as indicated in construction documents. The balance of the force main is to be installed via direct bury. The contractor shall confirm all measurements and quantities prior to bid. • The Work shall include all Erosion and Sediment Control measures as required by all Local, State, Federal & Municipal regulations per Project Specifications. • The Work is include but is not specifically limited to grading and/or removal and replacement of gravel areas as indicated in project documents. • The Work is to include all necessary permitting and coordination with all authorities having jurisdiction, to include local, State, Federal & Municipal entities, Property owners and Utilities impacted by the work.