The project consists of the following: Removal of the existing elevator cylinder from the original well hole and install a new cylinder with sealed pvc protection will be installed replacing the existing. The cylinder shall be of a double bottom design constructed of steel pipe of sufficient thickness and suitable for the operating pressure as prescribed by the latest revision of the ASME A17.1 or CAN3-B44 codes. The top of the cylinder shall be equipped with a new cylinder head with a drip ring to collect any oil seepage as well as an internal guide ring and self-adjusting packing. The cylinder exterior shall be covered with a protective coating. Sealed PVC Protection helps protect the cylinder from corrosion, permits monitoring and evacuation of liquids to make sure the cylinder does not come in contact with water, and helps contain oil should the cylinder leak. The sealed PVC Protection can help protect your property against possible environmental contamination and clean-up costs. The new cylinder shall be installed plumb and shall operate freely with minimum friction. Installation of a new plunger shall be constructed of selected steel tubing or pipe of proper diameter machined true and smooth with a fine polished finish. The plunger shall be provided with a stop ring electrically welded to it to prevent the plunger from leaving the cylinder. The plunger shall be installed plumb and shall operate freely with minimum friction.