1.4 SCOPE OF WORK The work to be performed will include, but is not limited to the following items, which shall be provided by the contractor: A. Furnishing all labor, materials, tools, equipment and incidentals and performing all operations in connection with CIPP installation and all associated activities such as tap cutting and reinstatement, and all others described in Section 06000 – Sewer Lining CIPP. B. Any additional areas that is required to be removed or modified that exceeds the area or length indicated in the bid document must be approved by the engineer of record prior to the demolition. No payment will be made for any work not identified in the bid document without having been approved by the engineer of record prior to the work being completed.