• Review existing 2018 SICI Preliminary Design Report and confirm route & alignment recommendations. • Perform data collection and field survey as necessary. • Perform utility investigations and coordination to prevent conflicts with design. • Perform in depth hydraulic analysis, to assure the new pipeline has the capacity to meet the design flow requirements that are to be provided by COP/SROG. • Prepare easement documents for proposed alignment. • Coordinate with the COP Real Estate Division as necessary. • Perform detailed geotechnical investigations including corrosion potential of soils. • Prepare design concept report and design documents including drawings, technical specifications, and special provisions for constructing the redundant force main project. • Perform asset management data coordination. • Prepare preliminary and final construction cost estimates. • Potholing to confirm location of underground utilities; and other investigative data and/or reports • Prepare project schedules and hold progress meetings and workshops as needed to complete the work. • Assist the City in any required environmental, cultural surveys, and in obtaining any required local, county, state, or national permits and approvals. • Coordinate with the COP Street Transportation Department and other outside agencies as needed. • Coordinate with other agencies for projects within the impacted area. • Provide public information services based on project impacts. • Prepare and/or coordinate MOPOs (Maintenance of Plant Operation) as needed for construction activities. • Actively coordinate and communicate with CMAR (if selected) and City staff for all related activities. • Provide pre-construction services including reviewing Guaranteed Maximum Price (GMPs) project schedule, construction bid price, and subcontractor selection plans (if CMAR is selected). • Assist City in any required environmental, cultural surveys, and in obtaining any required local, county, state, or national permits and approvals.