Remove portions of existing site paving and soils to expose foundation systems. Remove all paints from exposed brick foundations. Tuckpoint all foundations. Provide new waterproofing system at perimeter of entire basement/foundation system down to existing footings. Provide new perimeter foundation drain tile. Backfill as required. Provide new grading and site paving to maximize drainage away from existing structure. Remove the existing roof system down to the existing roof decking. Roof decking shall be inspected for damage and replacement of some roof decking should be anticipated. Provide new composite shingle roof system (exact material to be approved and selected by SHPO), including all new flashings, roof penetrations, sealants, copper gutters and copper downspouts. Remove existing deteriorated clapboard wood siding and shake shingle wood siding down to existing wall sheathing to remain. Inspect existing wall sheathing, replacement of some sheathing should be anticipated. Provide new wood siding system to match existing in type, size, finish, and exposure.