1 1 MOBILIZATION LUMP (1-09) SUM $ $ per LS 2 1 MINOR CHANGE EST (1-04) 50,000.00$ 50,000.00$ EST 3 1 SPCC PLAN LUMP (1-07) SUM $ $ per LS 4 1 CAP UTILIZATION INCENTIVE DOLLARS (1-07) 1,000.00$ 1,000.00$ DOL 5 1 CAP UTILIZATION PENALTY CALC (1-07) 0$ 0$ CALC 6 1 UNANTICIPATED SITE WORK EST (1-09) 85,000.00$ 85,000.00$ EST 7 1 TEMPORARY RELOCATION & REPLACEMENT OF SHED EST (1-09) 4,000.00$ 4,000.00$ EST 8 1 PROJECT TEMPORARY TRAFFIC CONTROL LUMP (1-10) SUM $ $ per LS 9 1 CLEARING AND GRUBBING LUMP (2-01) SUM $ $ 10 1 ROCK EXCAVATION INCL. HAUL EST (2-03) 78,000.00$ 78,000.00$ EST 11 1 SHORING OR EXTRA EXCAVATION CLASS A LUMP (2-09) SUM $ $ per LS 12 1,432 GENERAL EXCAVATION INCL. HAUL CUBIC (2-10) YARD $ $ per CY 13 600 CONSTRUCTION GEOTEXTILE FOR SEPARATION SQUARE (2-12) YARD $ $ per SY 14 120 CONSTRUCTION GEOTEXTILE FOR UNDERGROUND DRAINAGE SQUARE (2-12) YARD $ $ per SY 15 90 CRUSHED SURFACING BASE COURSE CUBIC (4-04) YARD