1 MOBILIZATION 1 LUMP SUM LUMP SUM $________________________ 2 MINOR CHANGE 1 EST $ 50,000.00 50,000.00 $ 3 CAP UTILIZATION INCENTIVE 1 LUMP SUM LUMP SUM $ 1,000.00 4 CAP UTILIZATION PENALTY 1 CALC DOL $ 0.00 5 SPCC PLAN 1 LUMP SUM LUMP SUM $________________________ 6 RECORD DRAWINGS (minimum bid $1,000) 1 LUMP SUM LUMP SUM $________________________ 7 CONTRACTOR SURVEYING 1 LUMP SUM LUMP SUM $________________________ 8 PROJECT TEMPORARY TRAFFIC CONTROL 1 LUMP SUM LUMP SUM $________________________ 9 CONSTRUCTION ACCESS AND STAGING 1 LUMP SUM LUMP SUM $________________________ 10 EROSION CONTROL AND WATER POLLUTION PREVENTION 1 LUMP SUM LUMP SUM $________________________ 11 ESC LEAD 60 DAY $__________________ $________________________ 12 HIGH VISIBILITY SILT FENCE 760 LINEAR FOOT $__________________ $________________________ 13 HIGH VISIBILITY FENCE 260 LINEAR FOOT $__________________ $________________________ 14 CLEARING AND GRUBBING 1 LUMP SUM LUMP SUM $________________________ 15 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 1 LUMP SUM LUMP SUM $________________________ 16 EXISTING CULVERT REMOVAL 2 EACH $__________________ $________________________ 17 CHANNEL EXCAVATION INCL. HAUL 4,150 CUBIC YARD $__________________ $________________________ 18 EMBANKMENT COMPACTION 2,400 CUBIC YARD $__________________ $________________________ 19 LEVEE SELECT BORROW 2,800 TON $__________________ $________________________ 20 LEVEE KEY EXCAVATION INCL. HAUL 125 CUBIC YARD