The sixth phase of the project includes the following elements: • Six (6) full traffic signal replacements o Robert D. Ray Drive & E Grand Avenue o E 4th Street & E Grand Avenue o E 6th Street & E Grand Avenue o Pennsylvania Avenue & E Grand Avenue o E 6th Street & E Locust Street o E 6th Street & E Walnut Street • Removal of three (3) full traffic signals o E 4th Street & E Locust Street o E 4th Street & E Walnut Street o E 7th Street & E Locust Street • Rectangular Rapid Flashing Beacon (RRFB) o E 7th Street & E Locust Street • Traffic Signal Cabinet/Controller/ITS Equipment and Fiber Optic Interconnection o 10 intersections generally in the East Village o 6 intersections generally on the west side of Downtown o 6 intersections on Grand Avenue from 28th Street to 56th Street o 4 intersections on 42nd Street from Grand Avenue to Crocker Street • Traffic Observation Cameras, Uninterruptable Power Supply (UPS) and Enhanced Detection Systems at various intersections. • Emergency Vehicle Preemption along Douglas Avenue/Euclid Avenue from Merle Hay Road to I-235 • Adaptive traffic signal control Concept of Operations document for SE 14th Street update and evaluation of adaptive technologies. • Adaptive traffic signal control for control for 23 intersections along SE 14th Street from Walker Street to Cummins Road and upgrade detection, install pedestrian pushbuttons and update signal heads to comply with PROWAG.