A. The work will be done under one prime contract that includes: General, Civil, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. Site: Site grading, embankment, and bituminous pavement Gas, electrical, water utilities Brine Building: Slab on grade foundation Wood frame construction Mechanical/ plumbing systems Water service installation Gas and electric service connections Metalroong and siding. Salt Storage Shelter: Construction of a nominal 80’-0” wide by 90’-0” long fabric covered steel framed building system, eithertruss arch or pre-engineered metal frame: includes engineering analysis, design and construction of foundation, concrete piers, and fabric covered steel framed system, including precast bunker panels. Engineering analysis and design. Complete analysis and design within 30 days of the Notice to Proceed. Covered Bins: Precast bunker panels with wood framing. Metalroong and siding.