This project consists of the rehabilitation and maintenance of the Midway Bridge structure over North Spring Lake. The project includes bridge and approach slab resurfacing, sidewalk improvements, approach slab repair, and drainage improvements. The work also includes all other items of construction including, but not limited to, removal and disposal of existing structures, flow diversion, excavation and fill, grading, sodding, and MOT. The work specified herein shall consist of furnishing all materials, equipment, labor, and operations necessary to complete the work as indicated in the plans and specifications enclosed herein. All work included in the Bid shall be completed within the contract time from the date specified in the Notice to Proceed. The construction shall include, but not be limited to, establishment and removal of MOT measures, the provision of approved signs and markings, excavations for and construction of new sidewalks and storm drainage, the construction of driveways and Right-of-Way restoration. Please note: This is a Sole Source Notification.