Scope of Work: The scope of work includes design and construction for: Staged demolition of the existing draw bridges, approach spans, fendering, and Tower A. New movable bridge structures carrying six tracks total, including replacement of the north and south trestles and fender system. Trackwork and associated signals to connect the new bridge tracks to the mainline tracks north of Tower A and the existing station tracks, including reconstruction of direct fixation and platform modifications where required. Track improvements extending out approximately 1.5 miles from North Station. Raising and modifying the North Bank Bridge to accommodate the new track alignment. A new Tower A building, positioned to best serve operation of the proposed new structure. Existing controls would be relocated from the temporary control tower to the new Tower A building. Replacement of up to three sets of Signal Instrument Houses (SIHs) and upgrades for all wayside devices, cables, and infrastructure serving the existing Draw One Bridge. New North Station Platform F will be constructed, tying into an existing partial platform, to serve new Station Tracks 11 and 12. New drainage systems, including water quality structures and new outfalls, on each trestle.