1. SCOPE OF WORK ***This is a three (3) part bid Scope of work #1: Upstairs Main Employee Bathrooms (Total 2 Bathrooms, 6 Stalls) • Install protective products to protect existing interior finishes. • Remove existing tile flooring, bathroom stalls, edging, sinks, countertops, mirrors and toilets as needed • Install new 8x8 neutral ceramic tile flooring, commercially rated with slip resistant surface • ¼ inch sanded grout lines, sealed • Thin set installation • Install a transition piece from hallway into each bathroom • Installation of neutral laminated restroom stall partitions, 2 bathrooms, 2 regular stalls and 1 handicap accessible stall per bathroom • All hardware required for installation and function including locks, hinges, brackets, wall and floor mounts and any other hardware • Installation of new laminated countertops. Countertops must be caulked around the edges • Installation of new white porcelain sinks • Hook sinks back up to water supply • Replace/Install toilets as needed. Replacements must include all hardware necessary for full functionality and sealed to the floor using a wax ring or applicable substitute • Install new 5” charcoal vinyl cove base where the wall and flooring intersect • Adhere new wall mirror approximately 24” x 42” • Disposal of all materials off-site and final cleanup. Scope of work #2: Downstairs Main Employee Bathrooms (Total 2 Bathrooms, 6 Stalls) • Install protective products to protect existing interior finishes. • Remove existing tile flooring, bathroom stalls, edging, sinks, countertops, mirrors and potentially toilets as needed • Install new 8x8 neutral ceramic tile flooring, commercially rated with slip resistant surface • ¼ inch sanded grout lines, sealed • Thin set installation • Install a transition piece from hallway into each bathroom • Installation of neutral laminated restroom stall partitions, 2 bathrooms, 2 regular stalls and 1 handicap accessible stall per bathroom • All hardware required for installation and function including locks, hinges, brackets, wall and floor mounts and any other hardware • Installation of new laminated countertops. Countertops must be caulked around the edges • Installation of new white porcelain sinks • Hook sinks back up to water supply • Replace/Install toilets as needed. Replacements must include all hardware necessary for full functioning and sealed to the floor using a wax ring or applicable substituation. • Install new 5” charcoal vinyl cove base where the wall and flooring intersect • Adhere new wall mirror approximately 24” x 42” • Disposal of all materials off-site and final cleanup. Scope of work #3: Gym Bathrooms (Total 2 Single Bathrooms, No Stalls) • Install protective products to protect existing interior finishes • Remove existing tile flooring, edging, sinks and toilets • Install new 8x8 neutral ceramic tile flooring, commercially rated with slip resistant surface • ¼ inch sanded grout lines, sealed • Thin set installation • Install a transition piece from gym into each bathroom • Reinstall sinks and hook back up to water supply • Reinstall toilets including all hardware necessary for full functionality, including wax seal or equivalent substitute • Disposal of all materials off-site and final cleanup.