The work includes but is not necessarily limited to: This Project will construct a new addition to the current Distribution facility for Des Moines Water Works. Prior to construction, demolition work will be required to remove the existing ramp and other limited items. This addition will fill the space between the Distribution and Stores buildings. This addition will be constructed with a masonry and steel structure with brick exterior walls. Aluminum entrances and sectional doors and a TPO roof will complete the envelope. A Cement paver on pedestals patio will be included on the roof. Limited ventilation, power and lighting are included in the new building. The locker room will be constructed as a storm safe area. Limited site work and utility/storm sewer work will be included.