Scope of Work – Preliminary Design Preliminary design and engineering services include, but are not limited to, the following: Preliminary Design (10 to 15% Schematic Design) Site Development/Planning Infrastructure Analysis Environmental Impact Analysis Archaeological Impact Analysis Geotechnical Analysis/Engineering Ingress/Egress Impact Analysis- Pedestrian and Vehicular Project Scheduling Cost Estimating Value Engineering Quality Assurance Assisting MSA with Professional and Technical Service Procurements as requested. All other deliverables outlined in the Sample Contract, Attachment G. a. Services 1. The A/E shall work with MSA and the Project Team, as directed, to plan, schedule and coordinate site access, meetings and interviews with key stakeholders identified by MSA and the HSMC. The A/E will meet with the 21 HSMC staff as many times as the parties deem necessary for the A/E to conduct the preliminary design. This may include, by way of example and not limitation, individual meetings, walk-throughs of the proposed site(s), etc. 2. The A/E shall conduct a kick-off meeting with the Project Team within seven (7) days of receiving a Notice to Proceed for preliminary design services. 3. The A/E shall provide preliminary reports and updates on the progress of the preliminary design as requested by MSA.