STREET QUANTITIES 1.0 Mobilization L.S. 1 $_______ $________ 2.0 Asphalt Excavation S.Y. 15,909.5 $_______ $________ 3.0 Concrete Excavation S.Y. 1,485.5 $_______ $________ 4.0 Sub-grade Repair C.Y. 100 $_______ $________ 5.0 6” Fly-Ash Sub-Grade Prep S.Y. 17,297 $_______ $________ 6.0 6” Crushed Concrete Patch Base S.Y. 73.5 $_______ $________ 7.0 Concrete Pavement (6")(AE)(NRDJ) S.Y. 15,546.5 $_______ $________ 8.0 Concrete Pavement (7")(AE)(NRDJ) S.Y. 449 $_______ $________ 9.0 6" (PCC) Pavement S.Y. 382 $_______ $________ 10.0 7" (PCC) Pavement S.Y. 756 $_______ $________ 11.0 7" Stamped Colored Concrete S.Y. 179 $_______ $________ 12.0 4" Concrete Sidewalk S.Y. 458 $_______ $________ 13.0 6" Barrier Curb L.F. 550 $_______ $________ 14.0 30" Standard Curb & Gutter L.F. 78 $_______ $________ 15.0 Remove & Replace 9" Concrete (NRDJ) S.Y. 105.5 $_______ $________ 16.0 Reverse Curb & Gutter L.F. 79 $_______ $________ 17.0 Remove/Replace Curb & Gutter L.F. 1,425.5 $_______ $________ 18.0 Reused Street Brick S.Y. 36.5 $_______ $________ 19.0 Type I ADA Ramp Each 10 $_______ $________ 20.0 Type II ADA Ramp Each 4 $_______ $________ 21.0 Remove Storm Improvements L.S. 1 $_______ $________ 22.0 Construction Staking L.S. 1 $_______ $________ 23.0 Erosion Control L.S. 1 $_______ $________ 24.0 Traffic Control L.S. 1 $_______ $________ ALT 6" Crushed Concrete Sub-Grade* S.Y. 1 $_______