The Contractor is to furnish all labor, materials, equipment, and permits (if any are required) to complete the below referenced project based on the following scope of work: • Remove existing roof down to metal substrate • Provide & install a fully adhered 60mil PVC roof system with 1/2 dens deck cover board. -Insulation to be r20 (3.5”) • Install crickets between scuppers and behind each HVAC unit. • Approximately 225’ walk pads at roof hatch & to each HVAC unit. • Paint gas lines safety yellow and pipe supports to be a non-wood product. • Flash all walls, pipes, curbs, and pitch pockets as needed. Replace all metal coping caps with new medium bronze 24 gauge. • Provide 20-year manufacturer NDL warranty. • All work will need to be scheduled in advance with Tim Hartman • The contractor will be responsible for any equipment needed for this bid (including lifts as there is not contractor roof access through the inside of the building) • All equipment and debris relating to this project will be removed from the site • The contractor will be responsible for any damage done to the building related to the replacing of the roof.