(Contractor must obtain and submit all permits prior to performing any work). Scope of Work shall include, but not be limited to: Provide all labor, equipment and materials for the architectural, structural and electrical work required for HGA Building 5 as recommended from the 40-Year Recertification Inspection Report. CONTRACTOR shall review all documents and scope of work provided by Miami-Dade Aviation Department (MDAD) for work to be completed. Please refer to the Plans for further description of the scope of work. Contractors must agree to perform all work in accordance with the scopes of work established by MDAD, the MCC 7360 contract’s terms and conditions, all required permits and inspections and all applicable federal, state and local laws, codes and regulations. For the MCC 7360 General Contract Conditions, refer to the following link: https://intrax.miamidade.gov/ciis/TheAmendedStandardConstructionGeneralContractConditions.pdf Any minor variation in the scope of work that is necessary to complete the intended work shall be considered incidental and will not warrant additional compensation. Any major variation encountered in the scope of work that is necessary to complete the intended work will be additional work and will be compensated through a contingency allowance account, dedicated allowance account, or change order. However, such major variation shall be completed without delay. Contractor shall use an adequate number of qualified workers who are thoroughly trained in the techniques required to properly complete the work specified. Contractor will own or have access to the equipment necessary and to meet all safety, insurance, and technical requirements of the owner and local, county, state, and federal regulating authorities. The grand total bid price shall be reflected on the RPQ Bid Form – Attachment 5A.