: This project consists of the installation of new traffic signals and roadway widening. The work includes approximately 509 CY of Removal of Unsuitable Material, 790 Ton of Subbase Granular Material, Ty. B, 2,653 SY of 8” PCC Pavement, 1,121 FT of Combination Concrete Curb & Gutter Removal and Replacement, 2,054 TON of Hot-Mix Asphalt, traffic signal equipment, and all other necessary items and incidentals required to complete this project according to the plans and specifications. TREE REMOVAL (6 TO 15 UNITS DIAMETER); GEOTECHNICAL FABRIC FOR GROUND STABILIZATION; SUBBASE GRANULAR MATERIAL, TYPE B; POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL9.5FG, N90; CLASS B PATCHES, TYPE III, 8 INCH; MANHOLES, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, CLOSED LID; COMBINATION CONCRETE CURB AND GUTTER, TYPE B6.18; UNDERGROUND CONDUIT, PVC, 3" DIA.