The work consists of the following: 1. Demolition of existing and installation of two (2) new bar screens and washer/compactors in the Influent Pumping Station. 2. Demolition of existing and installation of two (2) new grit classifiers/separators and replacement of the existing process piping and other miscellaneous pipe in the Grit Pump Building. 3. Demolition of existing and installation of new Dissolved Air Filtration (DAF) equipment in the DAF Tank. Replacement of equipment located in the DAF/Rotary Drum Thickener (RDT) Building associated with the DAF process such as sludge transfer pumps, recirculation pumps, saturation tank, air compressors and various instrumentation. Modification and rehabilitation of piping associate with DAF equipment in the DAF/RDT Building. 4. Demolition of existing chemical scrubber odor control system in the DAF/RDT Building, and installation of two (2) new radial carbon adsorption units and associated equipment and piping east of the DAF/RDT Building. 5. Recoat and other rehabilitation of the Unthickened Waste Activated Sludge (UWAS) Tank...