• A new water supply service from MWW. MWW has a 12-inch watermain in Edgewood Avenue. • Below-grade concrete meter vault including personnel access, power, heating, dehumidification, chlorine analyzer, sump pit with pump discharging above grade. • Isolation valves, piping and pressure reducing valves to reduce the incoming water pressure from the current 93-96 psi to 65 psi. • Communication equipment to be incorporated into the Village’s existing monitoring system and utilize the Village’s standard cellular hardware, including: o Flow o Pressure o Chlorine residual o Entry o Flood o Temperature o Power • Sample water discharge conduit form the chlorine residual analyzer into the vault sump it • In-place abandonment of existing meter vault and access, if relocated structure is feasible • All associated surface restoration.