System Refresh: Complete refresh of all subsystems while maintaining operational continuity, when possible, with existing, not yet end-of-life components. • Installation and Configuration: Full cycle from assessment, design of replacement, to strategic refresh, including: • Integrate existing cameras (32 minimum) with provisions for PTZ and audio across key locations. • Ensure high-quality web-managed IP-based systems for expanded remote access. • Equipment Utilization: Prefer to retain current, functional subsystems for cost-effective transition. • Security Configurations: Implement a multi-tiered viewing protocol reflecting departmental security echelons. • Enterprise Redundancy & Data Management: Standard 30-day retention, with optional extended services for mission-critical recordings and offering redundant storage solutions when viable. • Infrastructure Consolidation: Refurbish Layer 3 network devices to ensure media room integrity and stability. • Power Systems: A robust UPS strategy to match or exceed current battery backup provisions with seamless power transition. • Training: Ensure robust operator training for system admins and technical helpdesk, covering initial setup and advanced troubleshooting