Contractor will provide all labor, materials and any needed rental equipment to remove and dispose of the existing heat pump units. The existing units are listed below: (see extent of new work below, everything demolished will be replaced under this contract) a. HP/DL Building • 2 (Two)- 5 Ton split systems Gas heat 2. Contractor will provide and install: • (Two) 5 split system units with gas heat as indicated in attached specification section 23 81 26 DX Split system air conditioning (all equipment needed). • Existing platforms for new air handlers will receive one 5/8" Type "X" piece of gypsum board and will fire caulk all penetrations with a one hour UL rated assembly. • All platforms will be lined with ductboard with joints sealed with mastic. • The new condensing units will be placed in the same footprint occupied by the existing units • (2) Two Digital programmable thermostats • Whips • Hardware • Condensate piping • Insulation • Integration of new air handler into the existing ducting in accordance with SMACNA standards. • Any other miscellaneous materials needed for a fully functional system - see specification