• Scheduling and coordinating vegetation control services with the Facility Director’s Representative. • Performing mowing. • Performing on-call (intermittent) tree removal. • Performing each deliverable work-component corresponding to the designated work-areas identified in Appendix D (Scope of Work) and outlined in Appendix E-1 and Appendix E-2 of this solicitation. • Providing labor, on-site supervision, tools, equipment, the means and methods for performing work. o Please note: On-site locations for storage of equipment shall be designated and agreed upon between the facility director’s representative and the contractor. Storage of equipment shall be limited to equipment used for implementing the work under the contract resulting from this IFB and shall be for a limited timeframe. The safety and security of equipment stored on-site shall be the contractor’s responsibility and OCFS shall not be held responsible for any damage, loss, or theft of equipment stored on the site. Contractor’s access to such equipment shall be subject to applicable facility protocols for access into the project site. With the exception of a brush hog for deliverable 2, OCFS does not recommend any specific equipment. • Performing the work with protection measures for landfill caps, subsurface piping, existing leachate collection pump stations, control panels, appurtenant devices, or causing settlement/rutting. • Performing the work with measures to avoid land settlement, land subsidence, and soil erosion, any of which may be caused by heavy equipment deployed on unstable ground.