The SW Walnut Street and SW Ordnance Road Water Main shall include the installation of approximately 3,550 LF of 8” water main along the west side of SW Walnut Street from SW 3rd Street to the north side of SW Ordnance Road, and along SW Ordnance Road from SW Cherry Street to an existing main adjacent to the police station. The water main along SW Walnut Street shall be bored installation while the water main along SW Ordnance Road shall be a combination of bored and open cut installation. Project also includes the addition of on-street diagonal parking on the west side of SW Walnut from approximately 125’ south of SW 3rd Street to approximately 70’ south of the High Trestle Trail. The construction improvements include approximately 3,120 LF of trenchless 8” water main, 430 LF of trenched 8” water main, approximately 1,330 SY of 7” thick PCC Class C-SUD street pavement, Class 10 excavation, subgrade preparation, driveways, sidewalks, pavement markings, temporary surface restoration, permanent surface restoration, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project.