1 Mobilization LS 1 $___________ $_____________ 2 Traffic Control LS 1 $___________ $_____________ 3 Cleaning and Grubbing LS 1 $___________ $_____________ 4 Topsoil, Strip, Salvage, Import and Respread CY 6,100 $___________ $_____________ 5 Earthwork/Excavation, Class 13 CY 31,700 $___________ $_____________ 6 Revetment stone (Rip Rap), Class B TON 2,200 $___________ $_____________ 7 Revetment stone (Rip Rap), Class E TON 5,600 $___________ $_____________ 8 Hydraulic Seeding and BFM Mulching, No fertilizer, Native Seed Mix Type A AC 4.6 $___________ $_____________ 9 Hydraulic Seeding and BFM Mulching, No fertilizer, Wetland/Native Seed Blend Type AB AC 3.1 $___________ $_____________ 10 Hydraulic Seeding and BFM Mulching, No fertilizer, Native Wetland Seed Mix Type B AC 0.3 $___________ $_____________ 11 Seeding and Mulching, No fertilizer, Native Grass and Forbs Seed Type A AC 11.5 $___________ $_____________ 12 Temporary Rolled Erosion Control Product (RECP), Type 4 (SUDAS) SY 28,000 $___________ $_____________ 13 Stormwater Polution Prevention LS 1 $___________ $_____________ 14 Erosion Control Measures, Install and Remove LF 6,300 $___________ $_____________ 15 Temporary Rolled Erosion Control Product (RECP), Type 1.D (SUDAS) SY 14,000.0 $___________ $_____________ 16 Hydraulic Seeding and BFM Mulching, No fertilizer, Erosion Control Seeding Type 4 (Urban) AC 20.7 $___________ $_____________ 17 Hydraulic Seeding and BFM Mulching, Fertilizer, Permanent Lawn Mixture Type 1 AC 0.2 $___________ $_____________ 18 Silt Fence LF 200 $___________ $_____________