COMMON ITEMS 1 020100 1.000 LS CONTRACTOR CONSTRUCTION STAKING / 2 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 3 012340 1.000 CUYD $40.000 $40.00 FOUNDATION STABILIZATION (SET PRICE) / 4 025323 1.000 LS MOBILIZATION / 5 070626 1.000 LS MOBILIZATION (DBE) / 6 025200 1.000 LS REMOVAL OF EXISTING STRUCTURES / 7 020001 1.000 LS $4,000.000 $4,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / NON PART 8 071554 1.000 CUYD $225.000 $225.00 CONCRETE FOR SEAL COURSE (SET PRICE) / 9 070580 1.000 HOUR $30.000 $30.00 FLAGGER (SET PRICE) / 10 060359 1.000 LS CLEANING EXISTING STRUCTURE / 11 012341 16.000 CUYD FOUNDATION STABILIZATION / 12 025186 76.000 CUYD GRANULAR BACKFILL (WINGWALLS) / 13 071021 21.000 SQYD BRIDGE BACKWALL PROTECTION SYSTEM / 14 025361 1.000 LS CLEARING AND GRUBBING / 15 012410 13044.000 CUYD COMMON EXCAVATION (RURAL SMALL) / 16 012415 13464.000 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) / 17 012420 4652.000 CUYD ROCK EXCAVATION / 18 012317 15793.000 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) / 19 012318 2038.000 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-0-5) / 20 010114 1.000 MGAL $40.000 $40.00 WATER (GRADING) (SET PRICE) / 21 030189 44804.000 SQYD SALVAGED TOPSOIL /