The Confederated Tribe of the Colville Reservation is seeking scope of work (SOW) and budget proposals for construction of a Steelhead Kelt Recondition Facility that will transform an existing and on-going seasonal acclimation facility. Construction proposals will need to follow the Kelt Recondition Facility design provided in Attachment D and E Kelt Recondition Plan. Minus the degassing tower and (2) ten-foot circular tanks supplied by the Colville Tribe. Note risk assessment identified in Appendix D regarding existing water pipe lines. Proposals shall include a detailed SOW and deliverables, a timeline (schedule) and budget. Proposed budget needs to be broken out by task to include administrative management, mobilization, construction elements (e.g 5-foot circulars, tank installation, piping, ect.), cleanup and any associated outside costs (e.g. TERO fees, Davis-Bacon wadges). Timelines (schedule) will need to include each task being met and duration (weeks), with an overall anticipated total project time. Proposals must include all items needed to complete this work (Section 3.02) on time and within budget, which must include required information that can be found in Section 3.03, plus any additional items that may have been inadvertently left out but would be needed to complete this project.