A. Work Included: Furnish, install and test assembled high speed, turbo blower systems. The package blower systems shall be complete, including blowers, motors, control panels, inlet air filter/silencers, relief valves, check valves, flexible connectors, piping, PLC, and other appurtenances as needed for a complete and operational system. All reasonable efforts should be made to utilize existing system components. B. Blowers shall be complete pre-packaged units. High efficiency, high speed motors shall be furnished. Units shall have an integrated air filter, variable speed drive, and controls. C. All components in this Section shall be factory fabricated by an authorized distributor of the blower unit into a complete operational package system. D. Communication of blowers shall have the capability to integrate with SCADA system.