Fixed Timber Dock (Includes 12-Inch Timber Piles): The bid price for this item shall include, but not be limited to, the necessary manpower, equipment, materials, hardware and incidentals needed to construct all components of the timber pier, as indicated in the construction plans. Components to be constructed include, but are not limited to: timber piles, cap boards, stringers, deck boards, handrail posts, splice blocks, mid-post spacer boards, vertical rails, horizontal rails, and the stainless steel cable rail system, etc. All timber must be free of splinters, cracks, knots, or sap. All timber must be treated with wood preservative products as indicated in the plans, to the treatment retention levels indicated in the plans, and must be southern yellow pine (SYP) meeting the grade requirements indicated in the plans. Any timber deemed unsuitable by the ENGINEER will be replaced at the CONTRACTOR'S expense.