0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 60 0003 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0004 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0005 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 60 0006 120165 CHANNELIZER (SURFACE MOUNTED) EA 170 0007 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 180 0008 120320 TEMPORARY BARRIER SYSTEM LF 2,720 0009 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 5 0010 129100 TEMPORARY CRASH CUSHION MODULE EA 21 0011 129108 TEMPORARY CRASH CUSHION TL-3 EA 14 0012 130100 JOB SITE MANAGEMENT LS LUMP SUM 0013 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0014 130331 STORMWATER ANNUAL REPORT EA 1 0015 130560 TEMPORARY SOIL BINDER SQYD 8,720 0016 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 15 0017 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 1 0018 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM 0019 140003 ASBESTOS COMPLIANCE PLAN LS LUMP SUM 0020 141120 TREATED WOOD WASTE LB 81,000 0021 146002 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS LUMP SUM 0022 039093 ASBESTOS SURVEY AND SAMPLING LS LUMP SUM 0023 153121 REMOVE CONCRETE (CY) CY 3.4 0024 160110 TEMPORARY HIGH-VISIBILITY FENCE LF 100 0025 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM 0026 190101 ROADWAY EXCAVATION CY 2.1 0027 210010 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1 0028 210120 DUFF (SQFT) SQFT 184,000 0029 210252 BONDED FIBER MATRIX (SQFT) SQFT 411,000 0030 390132 HOT MIX ASPHALT (TYPE A) TON 46 0031 390402 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED FRICTION COURSE) TON 3,530 0032 394074 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 830 0033 394077 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 2,520 0034 397005 TACK COAT TON 16 0035 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 34,800 0036 510072 (F) - STRUCTURAL CONCRETE, BARRIER SLAB CY 43 0037 710196 ADJUST INLET EA 1 0038 721420 CONCRETE (DITCH LINING) CY 1.7 0039 803210 TEMPORARY DESERT TORTOISE FENCE LF 2,000 0040 803220 DESERT TORTOISE FENCE LF 100