• Inspect approximately 2,500 sanitary and storm manholes that are located within the limits of the City’s Overlay Program. The Overlay Program and Manhole Inspections will be spread between all 10 wards within the City. • The 2025 Overlay Program manholes shall be inspected and data provided to the City by June 30, 2025. • The 2026 Overlay Program manholes shall be inspected and data provided to the City by September 30, 2025. • The inspections shall meet the standards of a Level 1 inspection as defined by the NASSCO Manhole Assessment and Certification Program (MACP). • Field data shall be entered using ArcGIS Survey 123 on a mobile device/tablet. • Provide repair recommendations and budget estimates for repairs presented in a Microsoft Excel format. Repair recommendations shall be separated by repair type, includes notes justifying the repair and a current market budget estimate for the repair. A severity rating of 0-3 (0 = good, 1 = moderate/fair, 2 = poor, 3 = severe) shall be assigned to each structure.