The Site will consist of the removal of slide material (mud) behind and against residence. The removal and replace of existing porch to access behind the house. The construction of 1 each Temporary Low Water Crossing to access temporary waste area. Mobilization is setup to provide for construction equipment to be delivered to the site. Structure Removal/Replacement is setup to address these features that may require location/replacement to facilitate normal reclamation activities. Site Prep is included, at both the sites and waste area to prep the areas for reclamation and material storage. Revegetation is included for all reveg efforts within the site and waste area. Roadway Stone is included to provide for access during normal reclamation. Waste Area: Material with be wasted on Temporary Waste area on Site. Permanent disposition to be determined. Any permits will be obtained prior to construction. No trees 3 diameter or more at breast height will be disturbed, no cave-like structures will be closed, and no cliff-lines will be disturbed.