A. Provide wellhouse back-up power system, including a new minimum 100-kW, natural gas engine generator, automatic transfer switch, power distribution junction box, and natural gas supply line plumbing, regulators, valves, exhaust piping, monitoring control panel, and related equipment. B. Provide concrete pad for mounting generator. C. Provide lighting panel to house circuits for generator appurtenances. Work including conduits, wire, and related equipment. D. Provide programming to integrate utility power signals into City SCADA System and screens. E. Demolition of existing stand-by natural gas engine, drive shaft, circuits, natural gas piping, concrete equipment base, exhaust piping, floor repair, and exterior wall penetration infilling. F. Provide all work, equipment, and materials to provide complete and operable project. The anticipated substantial completion date is May 29, 2026 and final completion date is July 31, 2026.