The City is currently working on a design for the redevelopment of an existing potable groundwater production well site to bring the existing, inactive well back into service. The redeveloped site will include, but shall not be limited to, the following infrastructure: • Rehabilitated 2,200 gallon per minute (GPM) water production well, including all new well equipment (pump, motor, column, etc.) except for the existing well casing • New 15 million gallon per day (MGD) firm capacity (20 MGD total) BPS 8A-B3 • Rehabilitation of the existing 6A-R2 PRVS with increased capacity (20 MGD) • Arsenic Treatment Facility (ATF) for the groundwater production well • New equalization basin with pump-to-waste and sewer discharge pumps • Installation of mechanical equipment for the well, BPS, PRVS, such as exposed and buried piping, valves, and actuators. • New electrical building with all new electrical gear, equipment, and instrumentation • Sound and visual screening walls • Site egress, grading, and drainage improvements