The project involves the design and construction of a 0.5 MGD package plant wastewater reclamation facility employing membrane bioreactor (MBR) technology and UV disinfection to produce tertiary treated and disinfected Title 22 reclaimed water that is in accordance with General WDR Order No. R3-2020-0020 to utilize for campus irrigation purposes. Additional Project components include lift station(s), force main(s), a lined 70-acre-foot earthen reservoir, and small swine storage tank. Water Infrastructure Improvement Project (WIIP) The 2035 Master Plan accounts for nearly 15,000 beds of student housing to accommodate the first and second year live-on requirements as well as maintaining housing for transfer and returning upper division students. To begin to meet this need, the University intends to design and construct three new student housing projects at the current North Mountain and K-1 parking sites and renovate six existing residential halls at the current South Mountain site.