1) Complete set of drawings from riser to sprinkler heads 2) Demo and install new supply piping for complete system. Haul away ALL Debris daily and keep workspace safe per OSHA guidelines. 3) Install all piping from supply to the second floor 4) Use all existing piping meeting code/sizing of existing basement system and Re-connect for continued coverage. 5) Install second floor system per drawings supplied by City as to meet current S-1 storage code and to eliminate as much future demolition when renovating. 6) Ensure sprinkler system in basement complies with NFPA 13 and complete all modifications needed to comply. 7) Repair all damage to floors, walls and ceiling including cleanup of any debris or material(s) that were not present before the work was started. 8) Obtain all required permits and inspections prior to beginning work and upon Completion. 9) Fire caulk ALL penetrations through walls, ceilings and floors. 10) Complete ALL required testing/tagging of new system to meet NFPA. 11) Provide your own dumpster or a method to dispose of your waste materials.