• All connector roads and all driveways shall be tied in to make a smooth transition as agreed upon by the Owner and the Contractor. • All GDOT road striping, signage and paving specifications shall be met throughout and upon completion of the project. • Paving plan and design mix shall be the contractor’s responsibility and shall be submitted and approved prior to starting. All testing shall be the responsibility of the contractor. • Contractor shall work daylight hours only, 5 days per week Monday- Friday. • Contractor pricing will include all driveway tie in with mainline, as well as intersections and turn lanes, if applicable. This includes saw cutting any driveways which protrude out into the widened roadway, if applicable. • Contractor pricing will include seeding, sewing and dressing all shoulders to 3% no more than 4% fall following final paving. Shoulders shall be a minimum of 2’ from edge of payment as approved by Public Works Director prior to sewing/seeding and straw. Any deviation will be pre-approved by the Public Works Director. Shoulder shall be re-built with materials agreed upon by the Owner and the Contractor. • All mailboxes moved shall meet the USPS guidelines. All mailboxes shall be installed with expandable cement foam (two parts). • Contractor pricing shall include all signage where required during and upon completion of the paving project to meet MUTCD. • All traffic control shall be the responsibility of the contractor. The plan for traffic control must be approved by Dawson County prior to start of construction. • Materials Transfer Vehicle (MTV) shall be utilized throughout the entire project. MTV and paving equipment shall meet the following: • MTV has a truck unloading system which receives mixture from the hauling equipment and independently delivers mixtures from the hauling equipment to the paving equipment. Has mixture remixing capability by either a storage bin in the MTV with a minimum capacity of 14 tons (13 megagrams) of mixture and a remixing system in the bottom of MTV storage bin, or a dual pugmill system located in the paver hopper insert with two full length transversely mounted paddle mixers to continuously blend the mixture as it discharges to a conveyor system. Provides to the paver a homogeneous, non-segregated mixture of uniform temperature with no more than 20°F (18° C) difference between the highest and lowest temperatures when measured transversely across the width of the mat in a straight line at a distance of one foot to three feet from the screed while the paver is operating.