The Contractor shall provide all labor, materials, tools, equipment, transportation, supplies, and incidentals necessary for the following major elements: The Contractor shall furnish and install nine (9) new pressure reducing stations, 132 individual pressure reducing valve assemblies, and approximately 5,800 linear feet of new water main, including an approximately 210 linear feet of 20-inch trenchless casing installation. This includes including all valves, appurtenances, connections to existing mains, water service replacement, power and communication conduits and cables, junction box, control panels and surface restorations. The work includes all materials, labor and services for a complete and operational installation. The City of Bainbridge Island reserves the right to reject any or all bids and to waive informalities in the bidding process.