Project Description 1. Project Number(s): N/A 2. County(ies): Fulton 3. Description: Engineering Design Service for Ellsworth Industrial Blvd Sidewalk Ellsworth Industrial Blvd connects two important east-west corridors, Chattahoochee Avenue and Huff Road. Later this year, the Beltline will also cross Ellsworth Industrial Blvd at Elaine Ave yet there will be no complete sidewalk to access it from Huff Road. Improvements to Ellsworth Industrial Blvd are contemplated in the City-adopted Upper Westside Masterplan. This project will design a consistent sidewalk connection between Huff Road and the future Beltline at Elaine Ave. The desired sidewalk width is 10 feet with a planted buffer between the sidewalk and curb, where feasible. This design should contemplate drainage, landscaping, and lighting improvements, where needed, to facilitate safe pedestrian movement at all hours. The design extents are limited to public ROW or areas where the CID is able to negotiate donated ROW, and it will include narrowing the roadway down to 10-foot travel lanes. A qualified firm will approach the project design with a Vision Zero lens. The firm selected to complete the scope of work included in this RFQ needs to be qualified to complete engineering design according to the City of Atlanta’s Plan Development Procedures – Locally Funded Project. Engineering design must be approved by CID and the City. 4. Required Area Classes: Prime Consultants are defined as the firm submitting the Statement of Qualifications and the firm with whom UWCID will contract. The Team is defined as the Prime Consultant and their sub-consultants, who are considered team members. The Prime Consultant must be prequalified in the Area Classes identified below in Section 5.A. The Prime Consultant or sub-consultant team members must be prequalified in the Area Classes identified below in Section 5.B. Respondents should submit a summary form (example provided in Exhibit IV) which details the required area classes for the Prime Consultant and all sub-consultants or joint-venture of consultants on the team listed in the Statement of Qualifications. The area classes listed on the summary form must meet all required area classes or the team will be disqualified. The Prequalification Expiration Date must be current by the deadline stated for this RFQ