0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 560 0003 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 7 0004 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 50 0005 100100 DEVELOP WATER SUPPLY LS LUMP SUM 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 7,500 0009 120165 CHANNELIZER (SURFACE MOUNTED) EA 160 0010 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 250 0011 120320 TEMPORARY BARRIER SYSTEM LF 14,600 0012 129105 TEMPORARY CRASH CUSHION TL-2 EA 8 0013 129108 TEMPORARY CRASH CUSHION TL-3 EA 16 0014 036992 TEMPORARY ALTERNATIVE CRASH CUSHION SYSTEM EA 6 0015 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM EA 4 0016 130100 JOB SITE MANAGEMENT LS LUMP SUM 0017 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0018 130321 STORMWATER SAMPLING AND ANALYSIS DAY EA 28 0019 130331 STORMWATER ANNUAL REPORT EA 3 0020 130570 TEMPORARY COVER SQYD 3,250