0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 60 0003 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0004 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0005 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 30 0006 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 450 0007 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1,450 0008 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 60 0009 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM 0010 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 6 0011 130100 JOB SITE MANAGEMENT LS LUMP SUM 0012 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM 0013 141120 TREATED WOOD WASTE LB 950 0014 374002 ASPHALTIC EMULSION (FOG SEAL COAT) TON 0.3 0015 390137 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 1,140 0016 397005 TACK COAT TON 2.6 0017 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 10,700 0018 810120 REMOVE PAVEMENT MARKER EA 980 0019 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 3,740 0020 820270 REMOVE ROADSIDE SIGN (WOOD POST) EA 13