The City of Redlands (“City”) invites proposals from qualified engineering consultants to provide engineering design services to evaluate construction alternatives for the reservoirs and, upon selection of a preferred alternative by MUED staff, prepare detailed construction plans, specifications, and cost estimates to construct two (2) 10 MG (minimum) reservoirs, associated equipment, components, and facilities, in separate phases, that will replace the Sunset Reservoir. The City intends to construct one (1) reservoir and associated equipment in FY 26/27. The second reservoir is not anticipated to be constructed for several years. Therefore, the Consultant is to prepare one (1) construction plan set that includes two (2) construction phases (1 for each reservoir). The first reservoir constructed must be fully operational and remain operational throughout construction of the second reservoir. The first construction phase will conclude with demolition of the existing Sunset Reservoir and associated infrastructure after the first newly constructed reservoir is operational. A detailed list and description are included within Section 3 – Scope of Services.