The proposed project shall include but is not limited to the following: (a) Remove and properly dispose of the existing flat EPDM roofs at 1070 East College Park Parkway (approximately 4,542 SF) and 1072 East College Park Parkway (approximately 5,494 SF), insulation, etc., down to the bare roof. (b) Remove existing drip edge in its entirety, approximately 580 LF. (c) Inspect roof deck and replace – with the equivalent – any deteriorated materials as directed by the DNR Project Manager on a unit price basis. (See Unit Price #1). (d) Inspect existing roof drains and replace – with the equivalent – any deteriorated materials as directed by the DNR Project Manager on a unit price basis (See Unit Price #2).(e) Existing roofs vent to be kept and protected during demolition. (f) Maintain all existing mounted equipment. This includes but is not limited to, antennas and/or radio equipment. (g) Install roof insulation, coverboard and EPDM roofing, approximately 10,036 SF total. (h) Install drip edge, approximately 580 LF. (i) Restore the site to a pre-construction condition to include debris removal. (j) Inspect roof drains and replace – with the equivalent – any deteriorated items as directed by field conditions and the DNR Project Manager on a unit price basis (See UNIT PRICE #2)