THE PROJECT GENERALLY CONSISTS OF THE FOLLOWING WORK: • PHASE 1 | SCHEDULE 1 – WATER MAIN INSTALLATION: ±490 LF of 12-inch PVC and ±400 LF of 8-inch PVC water main installed via open-cut methods through residential streets within the City of Sidney, Montana. Work will include typical water main appurtenances including, but not limited to, fire hydrants, gate valves, fittings, residential water service installations, and surface restoration. The work shall be substantially complete by no later than Friday, October 3, 2025 or within 60 calendar days from the Notice to Proceed for Schedule 1, whichever is sooner. A Substantial Completion will be issued upon completion of Phase 1 | Schedule I – Water Main Installation. Phase I | Schedule 2 – Water Main Installation may not proceed until spring of 2027. • PHASE 1 | SCHEDULE 2 – WATER MAIN INSTALLATION: ±415 LF of 12-inch PVC and ±60 LF of 8-inch PVC water main installed via open-cut methods through residential streets within the City of Sidney, Montana. Work will include typical water main appurtenances including, but not limited to, fire hydrants, gate valves, fittings, residential water service installations, and surface restoration. Phase I | Schedule 2 – Water Main Installation may not proceed until spring of 2027. Notice to Proceed for Schedule 2 will be issued no sooner than Monday, April 5, 2027. The work shall be substantially complete by no later than Friday, June 25, 2027 or within 45 calendar days from the Notice to Proceed for Schedule 2, whichever is sooner. Pending completion of the new Water Storage Tank, bid and awarded under a separate contract, work may be eligible to begin in the fall of 2026. • NOTE: This Project is part of a multi-phase project that will include replacing the existing elevated water storage tank with a new spheroid water storage tank and park/site restoration within North Park. These portions of work will be bid and awarded under a separate contract at a later date and are not included within this bid package. Refer to SECTION 01 11 00 SUMMARY OF WORK of the Contract Documents for additional detail.