Proposed project of Citywide Storm Drain Repairs will include but is not limited to: removing existing CMP pipes, furnishing and installing RCP pipes with beddings, furnishing and installing DIP pipes with beddings, placing grouted rip rap, removing and reconstructing or repairing damaged catch basins, removing and replacing concrete curbs and gutters, repairing concrete structure around drop inlet, furnishing and installing protection grating, removing and replacing manholes, removing and replacing CSP Inlets. The project consists of multiple site locations within the City of Riverside as specified on the attached detailed Construction Plans, Location Maps and Work Instructions outlined in Part 9 of these Special Provisions. Other Details Examination of Site of Work, Proposal Forms, Plans and Specifications. The bidder is required to carefully examine the site of work, Proposal Forms, Plans and Specifications for the work contemplated. The submission of a proposal shall be considered conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of all the Contract Documents.